|
| Reference Number | 4776
|
| Vessel Type | Tug
|
| Year Built | 1980
|
| LOA | 45 m
|
| Beam | 12 m
|
| Draft | 3.6 m
|
| GRT | 507 T
|
| NRT | 152 T
|
| Construction | Steel
|
| Construction Details | Rebuilt 2011 Singapore
|
| General Description | ANCHOR HANDLING TUG SUPPLY VESSEL BOLLARD PULL 40 TONS
|
| Engine Details | 2 x Yanmar 6Z-ET 1800hp
|
| Horsepower | 3,600 hp
|
| Auxiliary Engine | GM 6/71 299 kW
|
| Gearbox | 2 x Ulstein 600 GSC-S-K 2.2:1
|
| Propeller | 2 x CP 360 deg open propellers
|
| Thruster | Bow thruster 300hp Hydraulic with CPP - 3.4MT thrust
|
| Max Speed | 12 knots
|
| Service Speed | 10 knots
|
| Fuel Consumption | 12 knots = 8 tons per day
10 knots = 7.5 tons per day
|
| Accommodation | Officer 4 x 1 berths
Crew 2 x 4 berths
Passenger/crew 1 x 2 berths + 2 x 2 berths
Hospital 8 berths
Total 26 berths
|
| Radio | SSB - Stephas Engineering SEA 222 150 Watts
VHF - Skanti TRP 2500
VHF - Ray 53
|
| Radar | Furuno 1830 - 24nm
|
| G.P.S. | Furuno GP30
|
| Sounders | Data Marine 3000
|
| Auto Pilot | Wagner
|
| Other | WeatherFax Navtex RTeceiver ICS Nav 5 c/w Antenna
Computer + printer
Satellite phone
CARGO CAPACITIES
Max deck space 150m2
Deck Strength 3 tons m2
Cargo railing - provided
Fuel oil 300m3
Potable water 170m3
Freezer space 8.5m3
Cooler space 8.5m3
DISCHARGE RATES
Fuel oil 50m3 per hour @ 44m
Potable water 60m3 per hour @ 44m
EQUIPMENT
Towing winch - single drum
Line pull 165,375lbs
Bollard Pull 40 tons
Winch wire 44mm x 730m
Stern roller - fitted
Shark Jaws Ulstein 440MT
FIRE FIGHTING EQUIPMENT
Fire Pump 1200m3 per hour (1/2 FiFi))
Fire monitor - 3 units
Spray boom - 2 units, 5m with 5 nozzles
SPECIAL EQUIPMENT
Oil spill dispersant tank 5,600 litres capacity
Semi Rigid FRC 6 man capacity with launching
Welding machine 250Amp
|
| Survey Class | ABS + BKI
Vessel built to comply with SOLAS regulations
Class Certificate Expiry 31 Mar 2020
09 Feb 2016 Annual Endorsement
Class Surveys
Survey Type
Annual Hull Survey 2 Due Date 31 Mar 2017
Annual Machinery Survey 2 Due Date 31 Mar 2017
Drydocking Survey Due Date 02 Feb 2018
Intermediate Hull Survey 9 Due Date 30 Sep 2017
Special Periodical Survey - Hull 9 Due Date 31 Mar 2020
Special Periodical Survey - Machinery 9 Due Date 31 Mar 2020
Tailshaft Survey - Tail Shaft P - Oil Due Date 11 Sep 2016
Tailshaft Survey - Tail Shaft S - Oil Due Date 11 Sep 2016
|
| Price | US$ 850,000.00
Plus GST and /or Taxes if any.
|
|
Plus GST and /or Taxes if any. All information is provided in good faith and is accurate to the best of our knowledge AT DATE OF LISTING. Buyers should verify information, by inspection, prior to purchase. We accept no responsibility for errors.
|